Which document is NOT part of the Agency Series Model Contract Documents (2003 Ed.)?

Prepare for the CMAA Construction Management Exam. Study with flashcards and multiple choice questions, each question includes hints and explanations. Get exam-ready now!

Multiple Choice

Which document is NOT part of the Agency Series Model Contract Documents (2003 Ed.)?

Explanation:
The Agency Series contracts are the set of forms that establish the construction manager as the owner’s agent, and they include an agreement between the Owner and the CM, an agreement between the Owner and the Contractor, and the General Conditions between the Owner and the Contractor. The lump-sum AIA A101 form sits outside that series; it’s a standard AIA contract between Owner and Contractor for a project priced as a lump sum and does not define the CM as the Owner’s agent under these documents. So the lump-sum A101 form is not part of the Agency Series.

The Agency Series contracts are the set of forms that establish the construction manager as the owner’s agent, and they include an agreement between the Owner and the CM, an agreement between the Owner and the Contractor, and the General Conditions between the Owner and the Contractor. The lump-sum AIA A101 form sits outside that series; it’s a standard AIA contract between Owner and Contractor for a project priced as a lump sum and does not define the CM as the Owner’s agent under these documents. So the lump-sum A101 form is not part of the Agency Series.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy